The fact that we will tell in this case study is an event that happens to many installers always in the throes of delays for the atmospheric conditions of installation and therefore to the reduction of the installation time of the castings in which the public administrations not knowing the technical aspects ask it is imperative that the work end date is respected.
A too precise calculation of the surface, some difference in level that needs to be recovered, something has been lost in mixing and here it isâĶ the color of a finishing product is missing!